Waterlase iPlus - Installing and Maintaining the Trunk Fiber
The video ‘Waterlase iPlus - Installing and Maintaining the Trunk Fiber’ was published on the BIOLASE Vimeo account on July 02, 2018. The video is 3 minutes and 29 seconds long.
Description
An instructional video from BIOLASE demonstrating the preferred method of installing and maintaining the optical fiber system for the Waterlase iPlus All Tissue Laser System.
